Burlington Diary March 2009
Sun.01.03.09. There has been no work on the project. I am becoming increasingly perturbed as this stagnation is now into its third month. There has never been as long a break as this. I am at a loss as to how to approach this problem.
Meanwhile, at the Oak on Sunday the band, ‘The Stags’ had a bizarre ‘quiz’ half way through their first set. There were occasional bonus prizes, a winner’s prize for the most correct answers but also a major reward for the funniest title of the team.
Strangely, the victorious team name turned out to be ‘Dick’s talking parrots and his clockwork monkeys’.
Strangely, the victorious team name turned out to be ‘Dick’s talking parrots and his clockwork monkeys’.
Sat.07.10.09. Suddenly Chris has awoken from his slumber. Colin has paid him a visit, having returned from other ‘works in progress’ expressing his desire to re-build the engine.
I am to get in touch with Paul on Monday to arrange a time when the engine is available for pick up.
No comments:
Post a Comment